Design and analysis of a road bridge for railway line reinstatement including the removal of the level crossing at Kerma Oran PK00+262

Loading...
Thumbnail Image
Date
2026-06-21
Authors
Gaham, Imad Eddine
Ara, Chaker
Journal Title
Journal ISSN
Volume Title
Publisher
ENSTP-FJ
Abstract
This work, carried out as part of a graduation project, aims to design and study a bridge located between kilometer points 00+262 and 00+493, with a total length of 231 meters. This bridge is part of a railway reinstatement project and the removal of a level crossing in the El Kerma area of Oran. The introduction of this thesis provides a bibliographical study on the phenomenon of torsion in bridges. Following a project presentation, the structural design began by proposing three distinct variants to meet the project's requirements. The optimal design was selected based on a multi-criteria analysis; the chosen structure is a constant-depth segmental bridge constructed using the balanced cantilever method. A detailed study of the superstructure and substructure was then carried out, including prestress design, seismic analysis, and the dimensioning of the various bridge components. Modeling was performed using Midas Civil software, and design checks were carried out in accordance with applicable standards and codes.
Description
149 p. : ill. ; 30 cm. + (1cd-rom). Bibliogr. Annexes.
Keywords
Prestressed concrete , Post-tensioning , Curved bridge , Segmental bridge , Substructure , Response spectrum , El Kerma (Oran, Algeria) , Oran (Algeria) , Béton précontraint , Précontrainte par post-tension , Pont courbe , Pont voussoir , Infrastructure , Spectre de réponse , El Kerma (Oran, Algérie) , Oran (Algérie)
Citation
Gaham, Imad Eddine; Arar, Chaker. Design and analysis of a road bridge for railway line reinstatement including the removal of the level crossing at Kerma Oran PK00+262. Mém. Ing., Alger, ENSTP-FJ, 2026.