Design and analysis of a road bridge for railway line reinstatement including the removal of the level crossing at Kerma Oran PK00+262

dc.contributor.authorGaham, Imad Eddine
dc.contributor.authorAra, Chaker
dc.contributor.otherBabakhouya, Y.
dc.contributor.otherBenbouzid, M.
dc.date.accessioned2026-09-28T13:59:20Z
dc.date.available2026-09-28T13:59:20Z
dc.date.issued2026-06-21
dc.description149 p. : ill. ; 30 cm. + (1cd-rom). Bibliogr. Annexes.
dc.description.abstractThis work, carried out as part of a graduation project, aims to design and study a bridge located between kilometer points 00+262 and 00+493, with a total length of 231 meters. This bridge is part of a railway reinstatement project and the removal of a level crossing in the El Kerma area of Oran. The introduction of this thesis provides a bibliographical study on the phenomenon of torsion in bridges. Following a project presentation, the structural design began by proposing three distinct variants to meet the project's requirements. The optimal design was selected based on a multi-criteria analysis; the chosen structure is a constant-depth segmental bridge constructed using the balanced cantilever method. A detailed study of the superstructure and substructure was then carried out, including prestress design, seismic analysis, and the dimensioning of the various bridge components. Modeling was performed using Midas Civil software, and design checks were carried out in accordance with applicable standards and codes.
dc.identifier.citationGaham, Imad Eddine; Arar, Chaker. Design and analysis of a road bridge for railway line reinstatement including the removal of the level crossing at Kerma Oran PK00+262. Mém. Ing., Alger, ENSTP-FJ, 2026.
dc.identifier.urihttp://dspace.enstp.edu.dz/handle/123456789/1267
dc.language.isoen
dc.publisherENSTP-FJ
dc.subjectPrestressed concrete
dc.subjectPost-tensioning
dc.subjectCurved bridge
dc.subjectSegmental bridge
dc.subjectSubstructure
dc.subjectResponse spectrum
dc.subjectEl Kerma (Oran, Algeria)
dc.subjectOran (Algeria)
dc.subjectBéton précontraint
dc.subjectPrécontrainte par post-tension
dc.subjectPont courbe
dc.subjectPont voussoir
dc.subjectInfrastructure
dc.subjectSpectre de réponse
dc.subjectEl Kerma (Oran, Algérie)
dc.subjectOran (Algérie)
dc.titleDesign and analysis of a road bridge for railway line reinstatement including the removal of the level crossing at Kerma Oran PK00+262
dc.typeMémoire d'Ingénieur d'Etat
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
W3224-26_Mig.pdf
Size:
39.16 MB
Format:
Adobe Portable Document Format
Description:
License bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed to upon submission
Description:
4
item.page.filesection.subject